Construction activity centre Swetterhage well underway
23-08-2022
At Gemiva's Swetterhage residential and work location, Kokon created the design for a new activity centre. The building will function as a day care centre for the clients of the location. Construction is well underway and is scheduled to be completed by the end of 2022.
In the activity centre there are 10 group rooms divided over two floors with various additional functions, such as individual rooms per group room, multifunctional rooms. This is the 4th phase of a long-running metamorphosis in which Kokon has been involved for almost 20 years: we started in 2003 with an urban development plan!
Like all projects completed at Swetterhage, this building has its own architectural style. Instead of traditional brickwork, another durable material was chosen as the facade cladding: Rockpanel. The use of a facade grid, the play with closed-open proportions and variations in the depth of the facade cladding create a diverse, fresh and playful image at the central park of Swetterhage.